5,900sf interior renovation with adjacent occupied tenants. Demolition of (3) previous tenant spaces to allow for consolidation of services at The Christ Hospital Redbank campus. Fast tracked 18wk schedule from DD Design to facility opening. Guaranteed Maximum Price (GMP) delivery, resulting in $19.5K savings returned to the Owner. Self performed work included: demolition, concrete, metal studs/ drywall, rough carpentry, doors/ frames/ hardware installation, casework installation, wall protection, specialties, and installation of owner-furnished equipment.